The building structure over the main sports hall was designed using single pieces of curved Glulam timber beams, spanning the full 20 m, between regularly spaced steel columns with in the building elevation wall line. Stability of the building structure was provided through portal action in one direction and simple cross bracing in the other, giving a clear internal space, and allowing continuous strip glazing at the eaves level of the building to flood the sports hall with natural light.